Date Type & Industry Description Documents
Other Industries
Transcript
Other Industries
Agenda
SMC Conference & Function Centre 66 Goulburn StreetSydney
Energy
Fact Sheet
Ausgrid, TransGrid and Endeavour Energy are required to report quarterly to IPART on their compliance with the obligations.
Energy
Letter
On 9 August 2017, the Premier wrote to IPART to extend the time that IPART is to review the caps on early termination fees from 20 December 2017 to 20 Decemb
Energy
Draft Guidelines / Procedures
This document describes audit principles and processes to be applied when undertaking audits for IPART of electricity network operator compliance with variou
Energy
Draft Guidelines / Procedures
This document provides guidance to auditor and auditees on auditing compliance with Safety Management System obligations held in the Electricity Supply (Safe
Energy
Draft Guidelines / Procedures
This document provides guidance to auditor and auditees on auditing compliance with Critical infrastructure licence conditions in the electricity network ope
Energy
Draft Guidelines / Procedures
This document provides guidance to auditor and auditees on auditing compliance with reliability and performance licence conditions in the electricity network
Energy
Draft Guidelines / Procedures
This document provides guidance to auditor and auditees on auditing compliance with employment guarantees in Schedule 4 of the Electricity Network Asset ( Au
Energy
Draft Guidelines / Procedures
This document provides guidance to auditor and auditees on auditing compliance with the NSW Code of Practice for Authorised Network Operators which relates t
Energy
Draft Reporting Manual
This Reporting Manual provides an overview of the suite of reporting manual and a table summarising the regular reporting requirements for ENOs.
Energy
Draft Reporting Manual
This Reporting Manual provides minimum reporting requirements for ENO Annual report on the performance of their safety management systems as required under C
Energy
Draft Reporting Manual
This Reporting Manual provides minimum reporting requirements for ENO Annual reporting on their bushfire risk management.
Energy
Draft Reporting Manual
This Reporting Manual describes how to report serious electricity works accidents (SEWAs) to IPART, as well as how to obtain permission to disturb the site o
Energy
Draft Reporting Manual
This Reporting Manual describes how to report compliance with most conditions in Electricity network operator licences, and is relevant to the licensed netwo
Energy
Draft Reporting Manual
This Reporting Manual describes how to report compliance with ‘critical infrastructure licence conditions’ in electricity network operator licences of TransG
Energy
Draft Reporting Manual
This Reporting Manual describes how to report compliance with distribution reliability and performance licence conditions and is relevant to Ausgrid, Endeavo
Energy
Draft Reporting Manual
This Reporting Manual describes how to report compliance with employment guarantees in Schedule 4 of the Electricity Network Asset ( Authorised Transactions)
Water
Fact Sheet
We have set a target timeline, or ‘clock’, of 34 weeks for our assessment of licence applications and variations under the Water Industry Competition Act 200
Energy
Fact Sheet
Summary Fact Sheet - Solar feed-in tariffs 2017/18 - June 2017